Steel castings · Europe · one PO
A 50 t steel casting, delivered machined. Under one PO.
Stratosteel delivers steel castings to 50 t single piece through long-term EU foundry partners. Demonstrated. Delivered machined and documented, not raw. Machining to 50 t static runs under the same PO. The NDT scope is agreed before the pour. Above 50 t, a qualified non-EU route reaches 135 t, disclosed before you order. Send the drawing, an engineer answers within 48 hours.
First technical answer within 48 hours. Firm quote in 3 to 7 working days once the foundry is confirmed.
Demonstrated envelope
Running through long-term EU foundry partners under Stratosteel POs. The numbers are in service in the network today, documented.
| Single piece | to 50 t, EU foundry partners |
|---|---|
| Machining | integrated to 50 t static, same PO |
| Iron | ductile and grey iron, project basis |
| Bronze | CuSn10 / B101, centrifugally cast |
| NDT | UT, MT, PT in the network, RT via ISO 17025 laboratory |
| Certificates | EN 10204 3.1 standard, 3.2 with named third party on request |
| Traceability | heat number, pour date, operator on shift, inspector on duty |
On critical castings our engineers are present at the moments that decide the outcome: pour, controlled cooling, heat treatment, first piece. The witness function there is not delegated.
Above 50 t: the honest answer
Qualified route. Contracted, not yet exercised under a Stratosteel PO. Stated exactly as that.
| Single piece | to 135 t, qualified non-EU route |
|---|---|
| Disclosure | upfront, before you order |
| Origin | melt-and-pour origin stated in every quote, EU-only routes available on request, never assumed |
Two kinds of numbers, and we keep them apart. Demonstrated: in service in the network today, documented. Qualified: contracted and ready, not yet run under our PO. The label is always on the number.
Chain of custody runs from melt to delivery. Heat number, pour date, operator on shift, inspector on duty.
What happens next
After you send the drawing.
First technical answer
An engineer replies with feasibility, the proposed process route and open questions. Not an autoresponder.
Firm quote
Price, lead time, documentation scope. Issued once the production unit is confirmed, so the number holds.
One responsibility
Machining, verification, documentation and delivery under one contract with Stratosteel s.r.o. We manage the plants. Audits at the producing works are arranged through us, not around us.
Verified part, full file
EN 10204 3.1 certificate, CMM dimensional report, NDT protocol where specified. Traceability to heat number.
What we need from you: the drawing (PDF, STEP, DWG, DXF or IGES), material, quantity and target date. What we do not do: quote blind without a drawing, or start production without an agreed documentation scope. If the part is outside our envelope, we say so in the first reply. The full process →
What arrives at your dock
- The casting, machined to drawing, not raw
- EN 10204 3.1 material certificate, 3.2 with named third party on request
- NDT protocol per agreed scope: UT, MT, PT in the network, RT via ISO 17025 laboratory
- Chain of custody from melt to delivery: heat number, pour date, operator on shift, inspector on duty
- melt-and-pour origin stated in every quote, EU-only routes available on request. Where the non-EU route applies, we say so before you order.
Proof
Castings from our network run in machines of major mining and construction OEMs today. Network production, stated as exactly that: it runs in the network, not under our direct contract. Proof page →
Materials
Carbon and low-alloy cast steels. Manganese steel at 13 and 17 percent for wear applications. Stainless, duplex, tool steels, high-temperature grades for turbines. Ductile and grey iron on project basis. Bronze CuSn10 / B101, centrifugally cast.
NDT before the pour
The NDT scope is agreed before the pour, not negotiated after a defect. UT, MT, PT in the network. RT via an ISO 17025 accredited laboratory.
Urgent capacity
The network runs with deliberate spare capacity. When a supplier fails mid-program, send the drawing and write URGENT in the subject. The 48 hour answer includes the earliest realistic slot.
Real pours, real parts



Straight answers