Active programs, network production, qualification tracks, real parts. Each labeled exactly what it is. If a claim on this page cannot be checked in an audit, it does not belong on this page.
Active programs
Running now. Repeat orders.
Forestry equipment OEM, Austria
| Scope | Welded structures, machined frames, sub-assemblies |
|---|---|
| Volume | 600+ parts per machine, serial deliveries |
| Duration | 6 years, single contract, one PO stream |
| Materials | S690QL, S960QL, 42CrMo4, HARDOX |
| Docs | EN ISO 3834-2 process, EN 10204 3.1 |
Name disclosed under NDA.
Defence component program
| Scope | Precision-machined components, 5-axis, IT6 |
|---|---|
| Volume | 10 000+ units per year |
| Ramp | Samples to serial in one quarter |
| Materials | Alloy steels, stainless, aluminium alloys |
| Docs | EN 10204 3.1, CMM trace per batch, EU origin |
Name under NDA.
Network production
Where network parts run.
Stratosteel contracts production across its own plants and long-term EU partner plants. The partner side has its own track record in the field.
Castings from our network run in Liebherr and Caterpillar machines today. Heavy components for mining and off-highway equipment. That is network production, stated as exactly that: the foundry capacity behind a Stratosteel PO is the same capacity that serves those programs.
Qualification tracks
Tier 1 tracks under NDA.
No logo walls. Where there is no delivery yet, we say so. Current status, stated plainly:
| Tier 1 OEM tracks | Three Tier 1 OEM qualification tracks under NDA (marine, wind, rail), 2026. Engagements live, no delivery yet. |
|---|---|
| Rail | Live RFQ work in rolling stock components. Quoting stage. Name under NDA. |
| Mining, energy, heavy equipment | Tier 1 OEMs in these sectors are targets. They are listed nowhere on this site as customers. |
When a track becomes a program, it moves up this page. Not before.
Active parts
Real parts, stated plainly.
Customer details stay anonymous. The parts do not.

Marine deck machinery casting
Cast steel, machined to drawing. Network production. Docs: EN 10204 3.1 + dimensional report.

Brake disc
Full UT scope. Network production. Docs: EN 10204 3.1 + UT protocol + dimensional report.

Wind turbine hub
Ductile iron, form-position 0.03 to 0.05 mm. Network production. Docs: EN 10204 3.1 + CMM report.

Welded and machined structure
High-strength steel, welded then machined. Network production. Docs: EN 10204 3.1 + weld documentation + dimensional report.

Impeller, curved blades
5-axis machined to IT6. Network production. Docs: EN 10204 3.1 + CMM trace.

Armoured track set, finished
Austempered ductile iron, cast and finished. Network production. Docs: EN 10204 3.1 + dimensional report.
Quality system
One quality owner. CEO escalation.
Whatever route a part takes through our plants and partner network, we own responsibility for the result. One contract, one quality owner.
Documentation
EN 10204 3.1 material certificate is the standard, 3.2 with third-party witness on request. Dimensional report with CMM trace. Heat treatment records. EU origin documentation for tenders.
Inspection
NDT per specification: UT, MPI, RT, LP. CMM dimensional inspection on critical parts. Inspection and test plan agreed before production starts, not after.
Accountability
Named quality owner per order. Nonconformities reported to you, not hidden. Critical findings escalate to the CEO personally, with a corrective action and a date.
Certifications
Certificates, stated by holder.
Held by Stratosteel s.r.o.
| ISO 9001 | Quality management, certified |
|---|---|
| ISO 14001 | Environmental management, certified |
| ISO 45001 | Occupational health and safety, certified |
| EN ISO 3834-2 | Welding quality, in-house weldments to 10 t |
| EN 10204 3.1 | Documentation standard on deliveries, 3.2 on request |
Held by qualified partner plants
| EN 1090-2 EXC2 | Structural steel execution, partner scope to 64 t x 45 m. Certificate copies available under NDA. |
|---|
Capability sheet (PDF), audited financials and insurance certificates available on request: rfq@stratosteel.com.
Audit us
What an audit with us looks like.
Four steps. Document package within days, plant visit by appointment, the whole loop fits in two weeks.
Document package
NDA if you want one, then certificates, quality manual, organization and process overview. Sent within days, not weeks.
Plant visit
Open floor. You see the machines, the people and live parts in process. Any plant, any day, by appointment.
Live traceability check
Pick any part on the floor. We pull its material certificate, route card, inspection records and NDT reports while you watch.
Findings and closure
Findings logged, corrective actions with owners and dates.